Home > Products > Upender&Tilter > Mold flipper

O Type Bundle Turnover

The O Type Bundle Turnover (5-50 ton capacity) functions as a specialized material handling solution for industrial sheet metal processing. This system's versatile design serves multiple manufacturing sectors including automotive, electrical, and machinery production.

  • Standard: CE/ UL
  • Loading 5-50 T
  • Control: PLC
  • Application: whole stack of sheets

Request A Price Quote Download PDF
O Type Bundle Turnover
O Type Bundle Turnover-Fhope
O Type Bundle Turnover-manufacturer
O Type Bundle Turnover-for sale
O Type Bundle Turnover-factory

How To Choose a O Type Bundle Turnover: The Ultimate Guide

In modern manufacturing and material handling operations, selecting the right O type bundle turnover system is crucial for efficient production flow. Whether you're handling steel coils, wire bundles, or industrial materials, understanding the key aspects of these sophisticated machines can significantly impact your operational efficiency. This comprehensive guide will help you navigate through the essential factors to consider when choosing an O type turnover system for your facility.

Understanding O Type Turnover Specs: Core Features and Capabilities

The O type turnover specs form the foundation of your selection process. These specifications determine the machine's ability to handle your specific requirements efficiently and safely. Key technical parameters include:

Primary Specifications

  • Load Capacity: Standard ranges from 5-30 tons
  • Rotation Angle: 90° to 180° turning capability
  • Cycle Time: 60-180 seconds per complete rotation
  • Platform Dimensions: Customizable based on bundle size
  • Drive System: Hydraulic or electric-driven mechanisms

Modern turnover features typically include:

  • Precision control systems
  • Variable speed rotation
  • Position memory functions
  • Load centering mechanisms
  • Emergency stop systems

Understanding these specifications ensures your selected system can handle your material requirements while maintaining optimal performance levels.

Bundle Turner Costs: Investment Analysis and Value Considerations

When evaluating bundle turner costs, it's essential to consider both immediate and long-term financial implications. A comprehensive cost analysis should include:

Initial Investment Components

  • Base equipment cost: $30,000 - $80,000
  • Installation expenses: $5,000 - $15,000
  • Training costs: $2,000 - $5,000
  • Customization fees (if required)

Operational Cost Factors

  • Energy consumption rates
  • Maintenance requirements
  • Spare parts inventory
  • Operator training programs
  • Insurance considerations

The total investment should be weighed against potential benefits:

  • Increased productivity
  • Reduced manual handling risks
  • Lower labor costs
  • Improved material flow
  • Enhanced safety compliance

Essential Safety Guidelines for Bundle Handling

The turnover safety guide aspects are crucial for protecting both operators and materials. Modern bundle handling tips emphasize several key safety protocols:

Primary Safety Features

  1. Load Security Systems

    • Automatic clamp pressure control
    • Bundle position sensors
    • Anti-slip mechanisms
    • Emergency stop functions
    • Overload protection
  2. Operator Safety Measures

    • Safety barriers and gates
    • Light curtains
    • Warning systems
    • Operator position sensors
    • Remote control options
  3. Safety Protocols

    • Pre-operation checklistâ
    • Load testing procedures
    • Emergency response plans
    • Regular safety audits
    • Operator certification requirements

These safety features and protocols work together to create a comprehensive safety environment that protects both personnel and materials during operation. The integration of advanced safety technologies with proper operational procedures ensures reliable and secure bundle handling.

Turner Size Options: Matching Equipment to Your Needs

Selecting appropriate turner size options requires careful consideration of your facility's spatial constraints and operational requirements. Understanding the available configurations helps optimize your investment.

Size Configuration Guidelines

  • Standard Configurations
    • Small: 2000mm × 2000mm (platform)
    • Medium: 3000mm × 3000mm
    • Large: 4000mm × 4000mm
    • Custom dimensions available

Space Requirements

  • Operational Footprint: Base dimension plus 2000mm clearance
  • Height Requirements: Maximum height during rotation plus 500mm safety clearance
  • Maintenance Access: Minimum 1000mm on all sides
  • Control Panel Location: Additional 1500mm × 1000mm area

Professional Turner Installation: Key Steps and Requirements

Proper turner installation is critical for optimal performance and longevity. Following a systematic installation process ensures reliable operation and minimal future issues.

Installation Prerequisites

  1. Foundation Requirements

    • Concrete strength: Minimum 30MPa
    • Surface flatness: ±5mm over 3000mm
    • Anchor bolt specifications
    • Vibration isolation considerations
  2. Utility Requirements

    • Power supply specifications
    • Hydraulic system requirements
    • Compressed air needs
    • Control system wiring
  3. Site Preparation

    • Access route planning
    • Equipment positioning
    • Safety barrier installation
    • Control station setup

Coil Rotation Specs: Technical Parameters and Controls

Understanding coil rotation specs ensures precise material handling and optimal operational efficiency. These specifications determine the system's ability to handle various bundle types and sizes.

Technical Parameters

  • Rotation Speed Control
    • Minimum speed: 0.5 rpm
    • Maximum speed: 2.5 rpm
    • Speed adjustment increments: 0.1 rpm
    • Acceleration/deceleration control

Control System Features

  • PLC-based operation
  • Touch screen interface
  • Position feedback systems
  • Load monitoring
  • Data logging capabilities

O Type Maintenance: Ensuring Long-term Reliability

Proper O type maintenance is essential for maintaining optimal performance and extending equipment life. A comprehensive maintenance program includes:

Preventive Maintenance Schedule

  1. Daily Checks

    • Visual inspections
    • Fluid level monitoring
    • Safety system testing
    • Operating parameter verification
  2. Monthly Tasks

    • Lubrication points servicing
    • Belt tension checking
    • Control system calibration
    • Safety device testing
  3. Annual Maintenance

    • Complete system inspection
    • Hydraulic oil replacement
    • Bearing condition assessment
    • Structure integrity verification

Conclusion: Selecting Your Ideal O Type Bundle Turnover

Choosing the right O type bundle turnover system requires careful consideration of multiple factors, from technical specifications to long-term maintenance requirements. The ideal selection should:

  • Match your specific operational requirements
  • Fit within facility constraints
  • Meet safety standards
  • Provide reliable performance
  • Offer good value for investment

Success in implementing an O type bundle turnover system depends on:

  • Thorough planning
  • Proper installation
  • Regular maintenance
  • Operator training
  • Ongoing support

By carefully evaluating each aspect discussed in this guide, you can make an informed decision that provides reliable service for years to come. Remember that investing in quality equipment and proper maintenance programs ultimately leads to lower total ownership costs and improved operational efficiency.

Product Literature