Please check the video of the steel sheet inverter follow
Our proposal is make the turning structure into 2 parts.
The delivery time is 60 dyas after receiving the down payment.
The vessel takes 30-35 days to the east of the US.
The machine installet is very easy 1. connecting and locked the part one & part two. 2. power connection to start running.
The load inverter machine needs a 40 feet high container.
Since now the freight is raising too much that is app. 2 -3times more than the begining of 2021, and it still raising now.
Besides the valid time 10 days only.
So only a reference price can be provided now.
And we can re-offer the new price one week before delivery, which can be checked in market too.
Our team will providing the production drawing with 3D drawing and size for confirmation.
I’d like to check where the nearest sea port to your factory?
Sorry for the wrong price in the last one that base on 3200x3200mm, the refresh quotation is for the 15T with L2540x2540x1220mm
Any question feel free let me know.